What changes the price
- Project size and site access
- Material or finish tier
- Removal and disposal
- Ground, drainage, or structural conditions
- Permit rules and local labor availability
For 1 project, the current national model estimates $55,464, with a planning range of $39,934 to $85,970. Adjust project size and quality, then enter a ZIP to apply a metro or state wage factor to labor only. Materials, labor, permits, disposal, data dates, and sources are shown separately.
Reviewed by the HomeCostTotals data team Method and publication gate
| Component | Dollars | Share |
|---|---|---|
| Materials | $33,476 | 60.4% |
| Labor | $18,689 | 33.7% |
| Permits | $1,500 | 2.7% |
| Disposal | $1,800 | 3.2% |
National labor multiplier: 1.000×. Enter a ZIP to match a metro or state wage factor.
material = baseline material rate × quantity × index change × quality
labor = baseline labor rate × quantity × index change × ZIP wage multiplier
subtotal = material + labor + permit + disposal
Index escalation tracks the direction of input costs, not a local market price. Actual quotes vary with labor availability, permit requirements, site conditions, and local competition. Read the full methodology.
For 1 project at standard quality and national labor rates, the model applies the latest verified index deltas before adding permits and disposal.
Typical: $55,464
This static example is present before JavaScript loads; recalculate above for your project.
The estimate separates materials, labor, permit, and disposal using the quantities shown. It excludes financing, hidden damage, and optional work not selected.
ZIP is matched to a metro when available; otherwise a state wage factor is used. Only labor changes. Materials remain tied to national price indices.
No. It is a planning estimate. Confirm scope, code requirements, and price with licensed local contractors before committing funds.
The low and high multipliers capture ordinary variation in finish level, access, site conditions, and contractor availability.
The baseline is dated 2026-01-01. Index observations and their latest periods are displayed with every result.
Use it as an early planning range and include contingency. A site-specific quote remains necessary for a committed budget.